Baidu
map

Structural Assessment of Concrete Cable-Stayed Bridge after Replacement of Closure Segment: The Service Stage

Li, HJ

Li, HJ (corresponding author), Minist Transport, Res Inst Highway, 8 Xitucheng Rd, Beijing 100088, Peoples R China.

PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2020; 25 (3):

Baidu
map
Baidu
map
Baidu
map